US Bridges

County Highway over West Maple Fork Creek

Good

Colfax County, Nebraska · 3W N15 Stanton Cl · Structure no. C001900230

Built
2024
1 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
37 ft
3 main spans
Daily traffic
25
2003 count
Owner
County
County Highway Agency

About this bridge

County Highway over West Maple Fork Creek is a concrete culvert carrying County Highway over West Maple Fork Creek in Colfax County, Nebraska. It was built in 2024, so it is 1 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, projected to reach 42 by 2033. The structure is 37 ft (11.4 m) long. If it were closed, the detour would be 18.6 mi (30 km).

CarriesCounty Highway
CrossesWest Maple Fork Creek
Location3W N15 Stanton Cl
RouteCounty Highway 2
Coordinates41.7431, -97.1183
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert9 ExcellentNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.6 US tons
Inventory rating37.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length37 ft (11.4 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2003)
Projected traffic42 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed18.6 mi (30 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Highway over West Maple Fork Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is County Highway over West Maple Fork Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does County Highway over West Maple Fork Creek carry?

About 25 vehicles per day (2003 count).

How long is County Highway over West Maple Fork Creek?

The structure is 37 ft (11.4 m) long with a longest span of 12 ft (3.7 m).

Who owns County Highway over West Maple Fork Creek?

It is owned by the County Highway Agency.