US Bridges

CO RD 139 MI 13924 over Dry Wash

Good

Cheyenne County, Nebraska · JCT I80/L-17E 2E 3.6N · Structure no. C001716910

Built
2013
12 years old
Condition
Good
inspected November 2021
Type
Culvert
Concrete
Length
38 ft
3 main spans
Daily traffic
80
2011 count
Owner
County
County Highway Agency

About this bridge

CO RD 139 MI 13924 over Dry Wash is a concrete culvert carrying CO RD 139 MI 13924 over Dry Wash in Cheyenne County, Nebraska. It was built in 2013, so it is 12 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80 vehicles a day, projected to reach 80 by 2033. The structure is 38 ft (11.6 m) long and 42 ft wide. If it were closed, the detour would be 80.8 mi (130 km).

CarriesCO RD 139 MI 13924
CrossesDry Wash
LocationJCT I80/L-17E 2E 3.6N
RouteCounty Highway 1140
Coordinates41.1648, -102.7249
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.3 US tons
Inventory rating36.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length38 ft (11.6 m)
Longest span12 ft (3.7 m)
Deck width42 ft (12.8 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2011)
Projected traffic80 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed80.8 mi (130 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CO RD 139 MI 13924 over Dry Wash built?

It was built in 2013, making it 12 years old in 2025.

What condition is CO RD 139 MI 13924 over Dry Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2021.

How much traffic does CO RD 139 MI 13924 over Dry Wash carry?

About 80 vehicles per day (2011 count).

How long is CO RD 139 MI 13924 over Dry Wash?

The structure is 38 ft (11.6 m) long with a longest span of 12 ft (3.7 m) and a deck 42 ft wide.

Who owns CO RD 139 MI 13924 over Dry Wash?

It is owned by the County Highway Agency.