US Bridges

County Highway over West Bow Creek

Good

Cedar County, Nebraska · 4W of Fordyce · Structure no. C001400515

Built
2017
8 years old
Condition
Good
inspected July 2021
Type
Slab
Concrete Continuous
Length
122 ft
3 main spans
Daily traffic
55
2003 count
Owner
County
County Highway Agency

About this bridge

County Highway over West Bow Creek is a concrete continuous slab carrying County Highway over West Bow Creek in Cedar County, Nebraska. It was built in 2017, so it is 8 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 55 vehicles a day, projected to reach 93 by 2033. The structure is 122 ft (37.2 m) long and 31 ft wide. If it were closed, the detour would be 31.1 mi (50 km).

CarriesCounty Highway
CrossesWest Bow Creek
Location4W of Fordyce
RouteCounty Highway 5
Coordinates42.7023, -97.4461
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.7 US tons
Inventory rating43 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length122 ft (37.2 m)
Longest span48 ft (14.6 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic55 (2003)
Projected traffic93 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed31.1 mi (50 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Highway over West Bow Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is County Highway over West Bow Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2021.

How much traffic does County Highway over West Bow Creek carry?

About 55 vehicles per day (2003 count).

How long is County Highway over West Bow Creek?

The structure is 122 ft (37.2 m) long with a longest span of 48 ft (14.6 m) and a deck 31 ft wide.

Who owns County Highway over West Bow Creek?

It is owned by the County Highway Agency.