Ave M over N RR St/Hwy 30/UPRR
GoodBuffalo County, Nebraska · Ave M Kearney · Structure no. U135003920
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,276 ft
- 10 main spans
- Daily traffic
- 4,525
- 2012 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Ave M over N RR St/Hwy 30/UPRR is a prestressed concrete stringer/multi-beam or girder carrying Ave M over N RR St/Hwy 30/UPRR in Buffalo County, Nebraska. It was built in 2002, so it is 23 years old, younger than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,525 vehicles a day, roughly 2% of them trucks, projected to reach 4,190 by 2033. The structure is 1,276 ft (388.9 m) long and 43 ft wide. If it were closed, the detour would be 12.4 mi (20 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ave M over N RR St/Hwy 30/UPRR built?
It was built in 2002, making it 23 years old in 2025.
What condition is Ave M over N RR St/Hwy 30/UPRR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Ave M over N RR St/Hwy 30/UPRR carry?
About 4,525 vehicles per day (2012 count), of which roughly 2% are trucks.
How long is Ave M over N RR St/Hwy 30/UPRR?
The structure is 1,276 ft (388.9 m) long with a longest span of 154 ft (46.9 m) and a deck 43 ft wide.
Who owns Ave M over N RR St/Hwy 30/UPRR?
It is owned by the City or Municipal Highway Agency.