2nd Ave over Platte River N Channel
FairBuffalo County, Nebraska · In Kearney · Structure no. S044 04983L
- Built
- 1962
- 63 years old, rebuilt 1998
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 71 ft
- 1 main span
- Daily traffic
- 8,763
- 2012 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
2nd Ave over Platte River N Channel is a steel stringer/multi-beam or girder carrying 2nd Ave over Platte River N Channel in Buffalo County, Nebraska. It was built in 1962 and reconstructed in 1998, so it is 63 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,763 vehicles a day, roughly 4% of them trucks, projected to reach 12,706 by 2033. The structure is 71 ft (21.6 m) long and 40 ft wide. If it were closed, the detour would be 12.4 mi (20 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 2nd Ave over Platte River N Channel built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1998.
What condition is 2nd Ave over Platte River N Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does 2nd Ave over Platte River N Channel carry?
About 8,763 vehicles per day (2012 count), of which roughly 4% are trucks.
How long is 2nd Ave over Platte River N Channel?
The structure is 71 ft (21.6 m) long with a longest span of 70 ft (21.3 m) and a deck 40 ft wide.
Who owns 2nd Ave over Platte River N Channel?
It is owned by the City or Municipal Highway Agency.