US Bridges

C St/Fas 2025 over Wood River

Good

Buffalo County, Nebraska · Shelton C @ First · Structure no. M221007320

Built
2002
23 years old
Condition
Good
inspected November 2022
Type
Slab
Concrete Continuous
Length
102 ft
3 main spans
Daily traffic
555
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

C St/Fas 2025 over Wood River is a concrete continuous slab carrying C St/Fas 2025 over Wood River in Buffalo County, Nebraska. It was built in 2002, so it is 23 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 555 vehicles a day, projected to reach 555 by 2042. The structure is 102 ft (31.1 m) long and 32 ft wide. If it were closed, the detour would be 12.4 mi (20 km).

CarriesC St/Fas 2025
CrossesWood River
LocationShelton C @ First
RouteCity Street 2025
Coordinates40.7863, -98.7348
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating93.7 US tons
Inventory rating56.2 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length102 ft (31.1 m)
Longest span38 ft (11.6 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic555 (2022)
Projected traffic555 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C St/Fas 2025 over Wood River built?

It was built in 2002, making it 23 years old in 2025.

What condition is C St/Fas 2025 over Wood River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does C St/Fas 2025 over Wood River carry?

About 555 vehicles per day (2022 count).

How long is C St/Fas 2025 over Wood River?

The structure is 102 ft (31.1 m) long with a longest span of 38 ft (11.6 m) and a deck 32 ft wide.

Who owns C St/Fas 2025 over Wood River?

It is owned by the City or Municipal Highway Agency.