US Bridges

N71 over Sand Canyon Creek

Good

Box Butte County, Nebraska · Sjct N2/N71 3.3N · Structure no. S071 11336

Built
2005
20 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
770
2018 count
Owner
State
State Highway Agency

About this bridge

N71 over Sand Canyon Creek is a concrete culvert carrying N71 over Sand Canyon Creek in Box Butte County, Nebraska. It was built in 2005, so it is 20 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 770 vehicles a day, roughly 14% of them trucks, projected to reach 1,155 by 2038. The structure is 32 ft (9.8 m) long. If it were closed, the detour would be 391.5 mi (630 km).

CarriesN71
CrossesSand Canyon Creek
LocationSjct N2/N71 3.3N
RouteState Highway 71
Coordinates42.3698, -103.3081
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.4 US tons
Inventory rating36.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic770 (2018)
Projected traffic1,155 by 2038
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed391.5 mi (630 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N71 over Sand Canyon Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is N71 over Sand Canyon Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does N71 over Sand Canyon Creek carry?

About 770 vehicles per day (2018 count), of which roughly 14% are trucks.

How long is N71 over Sand Canyon Creek?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m).

Who owns N71 over Sand Canyon Creek?

It is owned by the State Highway Agency.