County Highway over Hall Creek
FairPosted for loadAntelope County, Nebraska · 1NW Neligh · Structure no. C000212720
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 32 ft
- 1 main span
- Daily traffic
- 30
- 2003 count
- Owner
- County
- County Highway Agency
About this bridge
County Highway over Hall Creek is a steel stringer/multi-beam or girder carrying County Highway over Hall Creek in Antelope County, Nebraska. It was built in 1960, so it is 65 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 30 vehicles a day, projected to reach 51 by 2042. The structure is 32 ft (9.8 m) long and 22 ft wide. If it were closed, the detour would be 37.3 mi (60 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Highway over Hall Creek built?
It was built in 1960, making it 65 years old in 2025.
What condition is County Highway over Hall Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does County Highway over Hall Creek carry?
About 30 vehicles per day (2003 count).
How long is County Highway over Hall Creek?
The structure is 32 ft (9.8 m) long with a longest span of 31 ft (9.4 m) and a deck 22 ft wide.
Who owns County Highway over Hall Creek?
It is owned by the County Highway Agency.