E Silver Lake Road over Oak Creek
FairPosted for loadAdams County, Nebraska · 6555 E. Silverlake RD · Structure no. C000124837
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 32 ft
- 1 main span
- Daily traffic
- 30
- 2003 count
- Owner
- County
- County Highway Agency
About this bridge
E Silver Lake Road over Oak Creek is a wood or timber stringer/multi-beam or girder carrying E Silver Lake Road over Oak Creek in Adams County, Nebraska. It was built in 1987, so it is 38 years old, younger than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 30 vehicles a day, projected to reach 51 by 2042. The structure is 32 ft (9.8 m) long and 20 ft wide. If it were closed, the detour would be 18.6 mi (30 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E Silver Lake Road over Oak Creek built?
It was built in 1987, making it 38 years old in 2025.
What condition is E Silver Lake Road over Oak Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does E Silver Lake Road over Oak Creek carry?
About 30 vehicles per day (2003 count).
How long is E Silver Lake Road over Oak Creek?
The structure is 32 ft (9.8 m) long with a longest span of 31 ft (9.4 m) and a deck 20 ft wide.
Who owns E Silver Lake Road over Oak Creek?
It is owned by the County Highway Agency.