Oregon Trail Road over Pawnee Creek
GoodAdams County, Nebraska · 1395 E Oregon Trail RD · Structure no. C000103020
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected October 2024
- Type
- Slab
- Concrete
- Length
- 52 ft
- 3 main spans
- Daily traffic
- 35
- 2003 count
- Owner
- County
- County Highway Agency
About this bridge
Oregon Trail Road over Pawnee Creek is a concrete slab carrying Oregon Trail Road over Pawnee Creek in Adams County, Nebraska. It was built in 2021, so it is 4 years old, younger than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 35 vehicles a day, projected to reach 59 by 2042. The structure is 52 ft (15.8 m) long and 29 ft wide. If it were closed, the detour would be 18.6 mi (30 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Oregon Trail Road over Pawnee Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is Oregon Trail Road over Pawnee Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Oregon Trail Road over Pawnee Creek carry?
About 35 vehicles per day (2003 count).
How long is Oregon Trail Road over Pawnee Creek?
The structure is 52 ft (15.8 m) long with a longest span of 31 ft (9.4 m) and a deck 29 ft wide.
Who owns Oregon Trail Road over Pawnee Creek?
It is owned by the County Highway Agency.