County Highway over I-29/HATTON Separation
GoodTraill County, North Dakota · 9 South Nd 15 · Structure no. 0029120989
- Built
- 1970
- 55 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 265 ft
- 4 main spans
- Daily traffic
- 120
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
County Highway over I-29/HATTON Separation is a steel continuous stringer/multi-beam or girder carrying County Highway over I-29/HATTON Separation in Traill County, North Dakota. It was built in 1970, so it is 55 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 120 vehicles a day, roughly 16% of them trucks, projected to reach 120 by 2039. The structure is 265 ft (80.8 m) long and 35 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Highway over I-29/HATTON Separation built?
It was built in 1970, making it 55 years old in 2025.
What condition is County Highway over I-29/HATTON Separation in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does County Highway over I-29/HATTON Separation carry?
About 120 vehicles per day (2019 count), of which roughly 16% are trucks.
How long is County Highway over I-29/HATTON Separation?
The structure is 265 ft (80.8 m) long with a longest span of 93 ft (28.3 m) and a deck 35 ft wide.
Who owns County Highway over I-29/HATTON Separation?
It is owned by the State Highway Agency.