County Highway over I94/MEDINA Interchange
GoodStutsman County, North Dakota · 2 East of Nd 30 · Structure no. 0094230288
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 264 ft
- 2 main spans
- Daily traffic
- 500
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
County Highway over I94/MEDINA Interchange is a prestressed concrete continuous stringer/multi-beam or girder carrying County Highway over I94/MEDINA Interchange in Stutsman County, North Dakota. It was built in 2009, so it is 16 years old, younger than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 500 vehicles a day, roughly 14% of them trucks, projected to reach 825 by 2040. The structure is 264 ft (80.5 m) long and 39 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Highway over I94/MEDINA Interchange built?
It was built in 2009, making it 16 years old in 2025.
What condition is County Highway over I94/MEDINA Interchange in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does County Highway over I94/MEDINA Interchange carry?
About 500 vehicles per day (2020 count), of which roughly 14% are trucks.
How long is County Highway over I94/MEDINA Interchange?
The structure is 264 ft (80.5 m) long with a longest span of 132 ft (40.2 m) and a deck 39 ft wide.
Who owns County Highway over I94/MEDINA Interchange?
It is owned by the State Highway Agency.