1st Street SW over James River
GoodStutsman County, North Dakota · 1st Street SW Jamestown · Structure no. 0000JMTN04
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected October 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 118 ft
- 3 main spans
- Daily traffic
- 1,045
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
1st Street SW over James River is a prestressed concrete box beam or girders - single or spread carrying 1st Street SW over James River in Stutsman County, North Dakota. It was built in 2005, so it is 20 years old, younger than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,045 vehicles a day, roughly 10% of them trucks, projected to reach 1,250 by 2039. The structure is 118 ft (36 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 1st Street SW over James River built?
It was built in 2005, making it 20 years old in 2025.
What condition is 1st Street SW over James River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does 1st Street SW over James River carry?
About 1,045 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is 1st Street SW over James River?
The structure is 118 ft (36 m) long with a longest span of 39 ft (11.9 m) and a deck 40 ft wide.
Who owns 1st Street SW over James River?
It is owned by the City or Municipal Highway Agency.