Interstate 29 over Drainage Ditch
GoodPembina County, North Dakota · 8 South of Nd 5 · Structure no. 0029195513 R
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 70 ft
- 1 main span
- Daily traffic
- 1,475
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Interstate 29 over Drainage Ditch is a prestressed concrete box beam or girders - single or spread carrying Interstate 29 over Drainage Ditch in Pembina County, North Dakota. It was built in 2004, so it is 21 years old, younger than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,475 vehicles a day, roughly 41% of them trucks, projected to reach 5,875 by 2039. The structure is 70 ft (21.3 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Interstate 29 over Drainage Ditch built?
It was built in 2004, making it 21 years old in 2025.
What condition is Interstate 29 over Drainage Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Interstate 29 over Drainage Ditch carry?
About 1,475 vehicles per day (2019 count), of which roughly 41% are trucks.
How long is Interstate 29 over Drainage Ditch?
The structure is 70 ft (21.3 m) long with a longest span of 66 ft (20.1 m) and a deck 43 ft wide.
Who owns Interstate 29 over Drainage Ditch?
It is owned by the State Highway Agency.