I-94 Business Loop over West Midway Separation
FairMorton County, North Dakota · 4 West of US 83 North · Structure no. 0094155026 R
- Built
- 1965
- 60 years old, rebuilt 2000
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 245 ft
- 3 main spans
- Daily traffic
- 16,750
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
I-94 Business Loop over West Midway Separation is a steel continuous stringer/multi-beam or girder carrying I-94 Business Loop over West Midway Separation in Morton County, North Dakota. It was built in 1965 and reconstructed in 2000, so it is 60 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,750 vehicles a day, roughly 6% of them trucks, projected to reach 16,750 by 2039. The structure is 245 ft (74.7 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-94 Business Loop over West Midway Separation built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2000.
What condition is I-94 Business Loop over West Midway Separation in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does I-94 Business Loop over West Midway Separation carry?
About 16,750 vehicles per day (2019 count), of which roughly 6% are trucks.
How long is I-94 Business Loop over West Midway Separation?
The structure is 245 ft (74.7 m) long with a longest span of 89 ft (27.1 m) and a deck 36 ft wide.
Who owns I-94 Business Loop over West Midway Separation?
It is owned by the State Highway Agency.