County Highway 83 over Heart River
FairPosted for loadMorton County, North Dakota · 4 South 7 East of Judson · Structure no. 000000030146150
- Built
- 1945
- 80 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 237 ft
- 3 main spans
- Daily traffic
- 30
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
County Highway 83 over Heart River is a steel continuous stringer/multi-beam or girder carrying County Highway 83 over Heart River in Morton County, North Dakota. It was built in 1945, so it is 80 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 30 vehicles a day, projected to reach 30 by 2038. The structure is 237 ft (72.2 m) long and 22 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Highway 83 over Heart River built?
It was built in 1945, making it 80 years old in 2025.
What condition is County Highway 83 over Heart River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does County Highway 83 over Heart River carry?
About 30 vehicles per day (2018 count).
How long is County Highway 83 over Heart River?
The structure is 237 ft (72.2 m) long with a longest span of 107 ft (32.6 m) and a deck 22 ft wide.
Who owns County Highway 83 over Heart River?
It is owned by the County Highway Agency.