US Bridges

County Highway over Timber Creek

Fair

McKenzie County, North Dakota · 9 North 4 East Alexander · Structure no. 000000027123120

Built
2002
23 years old
Condition
Fair
inspected November 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
68 ft
1 main span
Daily traffic
20
2018 count
Owner
County
County Highway Agency

About this bridge

County Highway over Timber Creek is a prestressed concrete box beam or girders - multiple carrying County Highway over Timber Creek in McKenzie County, North Dakota. It was built in 2002, so it is 23 years old, younger than the North Dakota average of 48.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 20 vehicles a day, projected to reach 20 by 2038. The structure is 68 ft (20.7 m) long and 30 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesCounty Highway
CrossesTimber Creek
Location9 North 4 East Alexander
RouteCounty Highway 0
Coordinates47.97123, -103.56081
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81.1 US tons
Inventory rating48.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length68 ft (20.7 m)
Longest span64 ft (19.5 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2018)
Projected traffic20 by 2038
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Highway over Timber Creek built?

It was built in 2002, making it 23 years old in 2025.

What condition is County Highway over Timber Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does County Highway over Timber Creek carry?

About 20 vehicles per day (2018 count).

How long is County Highway over Timber Creek?

The structure is 68 ft (20.7 m) long with a longest span of 64 ft (19.5 m) and a deck 30 ft wide.

Who owns County Highway over Timber Creek?

It is owned by the County Highway Agency.