County Highway over I-29/MERRIFIELD Sep
GoodGrand Forks County, North Dakota · 5 North Nd 15 · Structure no. 0029135082
- Built
- 1968
- 57 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 300 ft
- 4 main spans
- Daily traffic
- 675
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
County Highway over I-29/MERRIFIELD Sep is a steel continuous stringer/multi-beam or girder carrying County Highway over I-29/MERRIFIELD Sep in Grand Forks County, North Dakota. It was built in 1968, so it is 57 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 675 vehicles a day, roughly 10% of them trucks, projected to reach 675 by 2039. The structure is 300 ft (91.4 m) long and 34 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Highway over I-29/MERRIFIELD Sep built?
It was built in 1968, making it 57 years old in 2025.
What condition is County Highway over I-29/MERRIFIELD Sep in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does County Highway over I-29/MERRIFIELD Sep carry?
About 675 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is County Highway over I-29/MERRIFIELD Sep?
The structure is 300 ft (91.4 m) long with a longest span of 107 ft (32.6 m) and a deck 34 ft wide.
Who owns County Highway over I-29/MERRIFIELD Sep?
It is owned by the State Highway Agency.