US Bridges

US Highway 2 over Freshwater Coulee

Fair

Grand Forks County, North Dakota · 7 West of Grand Forks · Structure no. 0002348946 R

Built
1963
62 years old, rebuilt 2006
Condition
Fair
inspected August 2024
Type
Tee Beam
Concrete Continuous
Length
78 ft
2 main spans
Daily traffic
5,400
2019 count
Owner
State
State Highway Agency

About this bridge

US Highway 2 over Freshwater Coulee is a concrete continuous tee beam carrying US Highway 2 over Freshwater Coulee in Grand Forks County, North Dakota. It was built in 1963 and reconstructed in 2006, so it is 62 years old, older than the North Dakota average of 48.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,400 vehicles a day, roughly 10% of them trucks, projected to reach 5,400 by 2039. The structure is 78 ft (23.8 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS Highway 2
CrossesFreshwater Coulee
Location7 West of Grand Forks
RouteU.S. Route 2
Coordinates47.93285, -97.23425
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.9 US tons
Inventory rating46.7 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length78 ft (23.8 m)
Longest span38 ft (11.6 m)
Deck width43 ft (13 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,400 (2019)
Projected traffic5,400 by 2039
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US Highway 2 over Freshwater Coulee built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2006.

What condition is US Highway 2 over Freshwater Coulee in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does US Highway 2 over Freshwater Coulee carry?

About 5,400 vehicles per day (2019 count), of which roughly 10% are trucks.

How long is US Highway 2 over Freshwater Coulee?

The structure is 78 ft (23.8 m) long with a longest span of 38 ft (11.6 m) and a deck 43 ft wide.

Who owns US Highway 2 over Freshwater Coulee?

It is owned by the State Highway Agency.