US Bridges

Approach Drive over Drain Ditch

PoorPosted for load

Grand Forks County, North Dakota · 3 East Johnstown · Structure no. 000000018123041

Built
1954
71 years old
Condition
Poor
inspected August 2023
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
29 ft
1 main span
Daily traffic
2
2019 count
Owner
County
County Highway Agency

About this bridge

Approach Drive over Drain Ditch is a wood or timber stringer/multi-beam or girder carrying Approach Drive over Drain Ditch in Grand Forks County, North Dakota. It was built in 1954, so it is 71 years old, older than the North Dakota average of 48.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 2 vehicles a day, projected to reach 2 by 2039. The structure is 29 ft (8.8 m) long and 24 ft wide.

CarriesApproach Drive
CrossesDrain Ditch
Location3 East Johnstown
RouteCounty Highway 0
Coordinates48.15126, -97.41658
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating39.2 US tons
Inventory rating28.4 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadH 20
Structure length29 ft (8.8 m)
Longest span27 ft (8.2 m)
Deck width24 ft (7.4 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2 (2019)
Projected traffic2 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$59,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Approach Drive over Drain Ditch built?

It was built in 1954, making it 71 years old in 2025.

What condition is Approach Drive over Drain Ditch in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2023.

How much traffic does Approach Drive over Drain Ditch carry?

About 2 vehicles per day (2019 count).

How long is Approach Drive over Drain Ditch?

The structure is 29 ft (8.8 m) long with a longest span of 27 ft (8.2 m) and a deck 24 ft wide.

Who owns Approach Drive over Drain Ditch?

It is owned by the County Highway Agency.