S. West St. (CR11) over Creek
FairGolden Valley County, North Dakota · In Sentinel Butte · Structure no. 000000017110290
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected May 2023
- Type
- Channel Beam
- Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 150
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
S. West St. (CR11) over Creek is a concrete channel beam carrying S. West St. (CR11) over Creek in Golden Valley County, North Dakota. It was built in 1959, so it is 66 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 10% of them trucks, projected to reach 200 by 2039. The structure is 27 ft (8.2 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S. West St. (CR11) over Creek built?
It was built in 1959, making it 66 years old in 2025.
What condition is S. West St. (CR11) over Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does S. West St. (CR11) over Creek carry?
About 150 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is S. West St. (CR11) over Creek?
The structure is 27 ft (8.2 m) long with a longest span of 24 ft (7.3 m) and a deck 29 ft wide.
Who owns S. West St. (CR11) over Creek?
It is owned by the County Highway Agency.