County Highway 17 over Sheyenne Diversion
FairCass County, North Dakota · 1 South West Fargo · Structure no. 0000WF23
- Built
- 2019
- 6 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 276 ft
- 3 main spans
- Daily traffic
- 3,200
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
County Highway 17 over Sheyenne Diversion is a prestressed concrete box beam or girders - single or spread carrying County Highway 17 over Sheyenne Diversion in Cass County, North Dakota. It was built in 2019, so it is 6 years old, younger than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,200 vehicles a day, roughly 5% of them trucks, projected to reach 2,350 by 2039. The structure is 276 ft (84.1 m) long and 39 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Highway 17 over Sheyenne Diversion built?
It was built in 2019, making it 6 years old in 2025.
What condition is County Highway 17 over Sheyenne Diversion in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does County Highway 17 over Sheyenne Diversion carry?
About 3,200 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is County Highway 17 over Sheyenne Diversion?
The structure is 276 ft (84.1 m) long with a longest span of 92 ft (28 m) and a deck 39 ft wide.
Who owns County Highway 17 over Sheyenne Diversion?
It is owned by the City or Municipal Highway Agency.