I-94 Business Loop over I-94/EAST Medora Int
FairBillings County, North Dakota · East Medora Int · Structure no. 0094027243
- Built
- 1965
- 60 years old, rebuilt 1980
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 341 ft
- 4 main spans
- Daily traffic
- 800
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
I-94 Business Loop over I-94/EAST Medora Int is a steel continuous stringer/multi-beam or girder carrying I-94 Business Loop over I-94/EAST Medora Int in Billings County, North Dakota. It was built in 1965 and reconstructed in 1980, so it is 60 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 800 vehicles a day, roughly 10% of them trucks, projected to reach 876 by 2039. The structure is 341 ft (103.9 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-94 Business Loop over I-94/EAST Medora Int built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1980.
What condition is I-94 Business Loop over I-94/EAST Medora Int in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does I-94 Business Loop over I-94/EAST Medora Int carry?
About 800 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is I-94 Business Loop over I-94/EAST Medora Int?
The structure is 341 ft (103.9 m) long with a longest span of 105 ft (32 m) and a deck 30 ft wide.
Who owns I-94 Business Loop over I-94/EAST Medora Int?
It is owned by the State Highway Agency.