Co.Hiway 0227 over I-94/PEAK Interchange
GoodBarnes County, North Dakota · 6 West of N.D.32 · Structure no. 0094296741
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 260 ft
- 2 main spans
- Daily traffic
- 400
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Co.Hiway 0227 over I-94/PEAK Interchange is a prestressed concrete continuous stringer/multi-beam or girder carrying Co.Hiway 0227 over I-94/PEAK Interchange in Barnes County, North Dakota. It was built in 2005, so it is 20 years old, younger than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 400 vehicles a day, roughly 16% of them trucks, projected to reach 400 by 2040. The structure is 260 ft (79.2 m) long and 39 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Co.Hiway 0227 over I-94/PEAK Interchange built?
It was built in 2005, making it 20 years old in 2025.
What condition is Co.Hiway 0227 over I-94/PEAK Interchange in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Co.Hiway 0227 over I-94/PEAK Interchange carry?
About 400 vehicles per day (2020 count), of which roughly 16% are trucks.
How long is Co.Hiway 0227 over I-94/PEAK Interchange?
The structure is 260 ft (79.2 m) long with a longest span of 130 ft (39.6 m) and a deck 39 ft wide.
Who owns Co.Hiway 0227 over I-94/PEAK Interchange?
It is owned by the State Highway Agency.