County Hiway 0207 over I-94/ECKELSON Interchnge
FairBarnes County, North Dakota · 7 West of Nd 1 North · Structure no. 0094276385
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected November 2023
- Type
- Tee Beam
- Concrete Continuous
- Length
- 210 ft
- 4 main spans
- Daily traffic
- 210
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
County Hiway 0207 over I-94/ECKELSON Interchnge is a concrete continuous tee beam carrying County Hiway 0207 over I-94/ECKELSON Interchnge in Barnes County, North Dakota. It was built in 1957, so it is 68 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 210 vehicles a day, roughly 15% of them trucks, projected to reach 220 by 2040. The structure is 210 ft (64 m) long and 29 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Hiway 0207 over I-94/ECKELSON Interchnge built?
It was built in 1957, making it 68 years old in 2025.
What condition is County Hiway 0207 over I-94/ECKELSON Interchnge in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does County Hiway 0207 over I-94/ECKELSON Interchnge carry?
About 210 vehicles per day (2020 count), of which roughly 15% are trucks.
How long is County Hiway 0207 over I-94/ECKELSON Interchnge?
The structure is 210 ft (64 m) long with a longest span of 59 ft (18 m) and a deck 29 ft wide.
Who owns County Hiway 0207 over I-94/ECKELSON Interchnge?
It is owned by the State Highway Agency.