US Bridges

SR1719 over I-42

Good

Wayne County, North Carolina · 1 Mi. N. Jct. SR1003 · Structure no. 000000001910390

Built
2015
10 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
268 ft
2 main spans
Daily traffic
650
2022 count
Owner
State
State Highway Agency

About this bridge

SR1719 over I-42 is a prestressed concrete continuous stringer/multi-beam or girder carrying SR1719 over I-42 in Wayne County, North Carolina. It was built in 2015, so it is 10 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 650 vehicles a day, roughly 6% of them trucks, projected to reach 1,300 by 2040. The structure is 268 ft (81.6 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR1719
CrossesI-42
Location1 Mi. N. Jct. SR1003
RouteState Highway 1719
Coordinates35.35551, -77.84898
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating94.9 US tons
Inventory rating58 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length268 ft (81.6 m)
Longest span129 ft (39.3 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic650 (2022)
Projected traffic1,300 by 2040
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR1719 over I-42 built?

It was built in 2015, making it 10 years old in 2025.

What condition is SR1719 over I-42 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SR1719 over I-42 carry?

About 650 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is SR1719 over I-42?

The structure is 268 ft (81.6 m) long with a longest span of 129 ft (39.3 m) and a deck 43 ft wide.

Who owns SR1719 over I-42?

It is owned by the State Highway Agency.