US Bridges

US64 Ebl. over SR1310

Good

Washington County, North Carolina · 0.1MI.E.JCT.NC94 · Structure no. 000000001870122

Built
2004
21 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
120 ft
3 main spans
Daily traffic
5,900
2021 count
Owner
State
State Highway Agency

About this bridge

US64 Ebl. over SR1310 is a prestressed concrete continuous stringer/multi-beam or girder carrying US64 Ebl. over SR1310 in Washington County, North Carolina. It was built in 2004, so it is 21 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,900 vehicles a day, roughly 14% of them trucks, projected to reach 11,800 by 2040. The structure is 120 ft (36.5 m) long and 48 ft wide.

CarriesUS64 Ebl.
CrossesSR1310
Location0.1MI.E.JCT.NC94
RouteU.S. Route 64
Coordinates35.87488, -76.39014
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.9 US tons
Inventory rating50.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length120 ft (36.5 m)
Longest span63 ft (19.2 m)
Deck width48 ft (14.7 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,900 (2021)
Projected traffic11,800 by 2040
Trucks14%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US64 Ebl. over SR1310 built?

It was built in 2004, making it 21 years old in 2025.

What condition is US64 Ebl. over SR1310 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does US64 Ebl. over SR1310 carry?

About 5,900 vehicles per day (2021 count), of which roughly 14% are trucks.

How long is US64 Ebl. over SR1310?

The structure is 120 ft (36.5 m) long with a longest span of 63 ft (19.2 m) and a deck 48 ft wide.

Who owns US64 Ebl. over SR1310?

It is owned by the State Highway Agency.