SR1122 over Main Canal
FairPosted for loadWashington County, North Carolina · .05 MI.W.JCT.SR1126 · Structure no. 000000001870087
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 59 ft
- 3 main spans
- Daily traffic
- 360
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
SR1122 over Main Canal is a wood or timber stringer/multi-beam or girder carrying SR1122 over Main Canal in Washington County, North Carolina. It was built in 1964, so it is 61 years old, older than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 360 vehicles a day, roughly 6% of them trucks, projected to reach 720 by 2040. The structure is 59 ft (17.9 m) long and 35 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR1122 over Main Canal built?
It was built in 1964, making it 61 years old in 2025.
What condition is SR1122 over Main Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does SR1122 over Main Canal carry?
About 360 vehicles per day (2016 count), of which roughly 6% are trucks.
How long is SR1122 over Main Canal?
The structure is 59 ft (17.9 m) long with a longest span of 18 ft (5.4 m) and a deck 35 ft wide.
Who owns SR1122 over Main Canal?
It is owned by the State Highway Agency.