NC540W.TOLL over Future Camp Branch Green

Good

Wake County, North Carolina · 0.33 MI E JCT SR1389 · Structure no. 000000001831581

Built
2024
1 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
67 ft
1 main span
Daily traffic
17,500
2022 count
Owner
State
State Highway Agency

About this bridge

NC540W.TOLL over Future Camp Branch Green is a prestressed concrete stringer/multi-beam or girder carrying NC540W.TOLL over Future Camp Branch Green in Wake County, North Carolina. It was built in 2024, so it is 1 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,500 vehicles a day, roughly 12% of them trucks, projected to reach 35,000 by 2040. The structure is 67 ft (20.4 m) long and 63 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesNC540W.TOLL
CrossesFuture Camp Branch Green
Location0.33 MI E JCT SR1389
RouteState Highway 540
Coordinates35.67654, -78.77419
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.9 US tons
Inventory rating58 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length67 ft (20.4 m)
Longest span66 ft (20.1 m)
Deck width63 ft (19.3 m)
Roadway width60 ft (18.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,500 (2022)
Projected traffic35,000 by 2040
Trucks12%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NC540W.TOLL over Future Camp Branch Green built?

It was built in 2024, making it 1 years old in 2025.

What condition is NC540W.TOLL over Future Camp Branch Green in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does NC540W.TOLL over Future Camp Branch Green carry?

About 17,500 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is NC540W.TOLL over Future Camp Branch Green?

The structure is 67 ft (20.4 m) long with a longest span of 66 ft (20.1 m) and a deck 63 ft wide.

Who owns NC540W.TOLL over Future Camp Branch Green?

It is owned by the State Highway Agency.