US Bridges

NC540E.TOLL over SR6107

Good

Wake County, North Carolina · 0.25 MI E JCT NC55 · Structure no. 000000001831555

Built
2024
1 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
112 ft
1 main span
Daily traffic
17,500
2024 count
Owner
State
State Highway Agency

About this bridge

NC540E.TOLL over SR6107 is a prestressed concrete stringer/multi-beam or girder carrying NC540E.TOLL over SR6107 in Wake County, North Carolina. It was built in 2024, so it is 1 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,500 vehicles a day, roughly 12% of them trucks, projected to reach 35,000 by 2040. The structure is 112 ft (34.1 m) long and 81 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesNC540E.TOLL
CrossesSR6107
Location0.25 MI E JCT NC55
RouteState Highway 540
Coordinates35.68672, -78.83406
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70 US tons
Inventory rating53.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length112 ft (34.1 m)
Longest span108 ft (32.9 m)
Deck width81 ft (24.8 m)
Roadway width78 ft (23.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,500 (2024)
Projected traffic35,000 by 2040
Trucks12%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NC540E.TOLL over SR6107 built?

It was built in 2024, making it 1 years old in 2025.

What condition is NC540E.TOLL over SR6107 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does NC540E.TOLL over SR6107 carry?

About 17,500 vehicles per day (2024 count), of which roughly 12% are trucks.

How long is NC540E.TOLL over SR6107?

The structure is 112 ft (34.1 m) long with a longest span of 108 ft (32.9 m) and a deck 81 ft wide.

Who owns NC540E.TOLL over SR6107?

It is owned by the State Highway Agency.