US Bridges

Lockley Road over Creek

Good

Wake County, North Carolina · 0.4 Mi. W. Jct. SR1301 · Structure no. 000000001831482

Built
2017
8 years old
Condition
Good
inspected March 2024
Type
Slab
Prestressed Concrete
Length
62 ft
1 main span
Daily traffic
100
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lockley Road over Creek is a prestressed concrete slab carrying Lockley Road over Creek in Wake County, North Carolina. It was built in 2017, so it is 8 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 7% of them trucks, projected to reach 200 by 2040. The structure is 62 ft (18.8 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesLockley Road
CrossesCreek
Location0.4 Mi. W. Jct. SR1301
RouteCity Street 0
Coordinates35.67043, -78.80879
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.9 US tons
Inventory rating43 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length62 ft (18.8 m)
Longest span59 ft (17.9 m)
Deck width39 ft (11.8 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2013)
Projected traffic200 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lockley Road over Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is Lockley Road over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Lockley Road over Creek carry?

About 100 vehicles per day (2013 count), of which roughly 7% are trucks.

How long is Lockley Road over Creek?

The structure is 62 ft (18.8 m) long with a longest span of 59 ft (17.9 m) and a deck 39 ft wide.

Who owns Lockley Road over Creek?

It is owned by the City or Municipal Highway Agency.