US Bridges

US1S over I85N

Good

Vance County, North Carolina · 0.5 Mi. N. Jct. US158 · Structure no. 000000001810049

Built
2016
9 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
228 ft
2 main spans
Daily traffic
3,100
2021 count
Owner
State
State Highway Agency

About this bridge

US1S over I85N is a prestressed concrete stringer/multi-beam or girder carrying US1S over I85N in Vance County, North Carolina. It was built in 2016, so it is 9 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,100 vehicles a day, roughly 12% of them trucks, projected to reach 6,200 by 2040. The structure is 228 ft (69.4 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesUS1S
CrossesI85N
Location0.5 Mi. N. Jct. US158
RouteU.S. Route 1
Coordinates36.36977, -78.36178
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating74 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length228 ft (69.4 m)
Longest span96 ft (29.2 m)
Deck width41 ft (12.5 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,100 (2021)
Projected traffic6,200 by 2040
Trucks12%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US1S over I85N built?

It was built in 2016, making it 9 years old in 2025.

What condition is US1S over I85N in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does US1S over I85N carry?

About 3,100 vehicles per day (2021 count), of which roughly 12% are trucks.

How long is US1S over I85N?

The structure is 228 ft (69.4 m) long with a longest span of 96 ft (29.2 m) and a deck 41 ft wide.

Who owns US1S over I85N?

It is owned by the State Highway Agency.