US74 Byp Ebl over E. Fork Stewarts Creek
GoodUnion County, North Carolina · 0.1 Mi. W. Jct. SR1751 · Structure no. 000000001790502
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 331 ft
- 3 main spans
- Daily traffic
- 6,750
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US74 Byp Ebl over E. Fork Stewarts Creek is a prestressed concrete stringer/multi-beam or girder carrying US74 Byp Ebl over E. Fork Stewarts Creek in Union County, North Carolina. It was built in 2018, so it is 7 years old, younger than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,750 vehicles a day, roughly 14% of them trucks, projected to reach 13,500 by 2040. The structure is 331 ft (100.8 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US74 Byp Ebl over E. Fork Stewarts Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is US74 Byp Ebl over E. Fork Stewarts Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does US74 Byp Ebl over E. Fork Stewarts Creek carry?
About 6,750 vehicles per day (2022 count), of which roughly 14% are trucks.
How long is US74 Byp Ebl over E. Fork Stewarts Creek?
The structure is 331 ft (100.8 m) long with a longest span of 113 ft (34.4 m) and a deck 43 ft wide.
Who owns US74 Byp Ebl over E. Fork Stewarts Creek?
It is owned by the State Highway Agency.