Reservation Road over Fontana Dam Spillway
FairSwain County, North Carolina · On Fontana Dam · Structure no. 05G000000991830
- Built
- 1946
- 79 years old
- Condition
- Fair
- inspected March 2024
- Type
- Slab
- Concrete
- Length
- 255 ft
- 4 main spans
- Daily traffic
- 390
- 2021 count
- Owner
- Federal
- Tennessee Valley Authority
About this bridge
Reservation Road over Fontana Dam Spillway is a concrete slab carrying Reservation Road over Fontana Dam Spillway in Swain County, North Carolina. It was built in 1946, so it is 79 years old, older than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 390 vehicles a day, roughly 1% of them trucks, projected to reach 500 by 2041. The structure is 255 ft (77.7 m) long and 32 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Reservation Road over Fontana Dam Spillway built?
It was built in 1946, making it 79 years old in 2025.
What condition is Reservation Road over Fontana Dam Spillway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Reservation Road over Fontana Dam Spillway carry?
About 390 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is Reservation Road over Fontana Dam Spillway?
The structure is 255 ft (77.7 m) long with a longest span of 50 ft (15.2 m) and a deck 32 ft wide.
Who owns Reservation Road over Fontana Dam Spillway?
It is owned by the Tennessee Valley Authority.