US Bridges

I95 Sbl over SR2457

Fair

Robeson County, North Carolina · 1.2 Mi.N. of JCT.SR2455 · Structure no. 000000001550107

Built
1972
53 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
213 ft
4 main spans
Daily traffic
33,500
2020 count
Owner
State
State Highway Agency

About this bridge

I95 Sbl over SR2457 is a steel continuous stringer/multi-beam or girder carrying I95 Sbl over SR2457 in Robeson County, North Carolina. It was built in 1972, so it is 53 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 33,500 vehicles a day, roughly 23% of them trucks, projected to reach 67,000 by 2040. The structure is 213 ft (64.9 m) long and 42 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI95 Sbl
CrossesSR2457
Location1.2 Mi.N. of JCT.SR2455
RouteInterstate 95
Coordinates34.56059, -79.18079
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.9 US tons
Inventory rating53.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length213 ft (64.9 m)
Longest span65 ft (19.8 m)
Deck width42 ft (12.8 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic33,500 (2020)
Projected traffic67,000 by 2040
Trucks23%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I95 Sbl over SR2457 built?

It was built in 1972, making it 53 years old in 2025.

What condition is I95 Sbl over SR2457 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does I95 Sbl over SR2457 carry?

About 33,500 vehicles per day (2020 count), of which roughly 23% are trucks.

How long is I95 Sbl over SR2457?

The structure is 213 ft (64.9 m) long with a longest span of 65 ft (19.8 m) and a deck 42 ft wide.

Who owns I95 Sbl over SR2457?

It is owned by the State Highway Agency.