US Bridges

NC71 over Big Marsh Swamp

Good

Robeson County, North Carolina · 0.3 Mi. N. Jct. SR1752 · Structure no. 000000001550084

Built
1990
35 years old
Condition
Good
inspected April 2021
Type
Slab
Prestressed Concrete
Length
102 ft
2 main spans
Daily traffic
12,000
2019 count
Owner
State
State Highway Agency

About this bridge

NC71 over Big Marsh Swamp is a prestressed concrete slab carrying NC71 over Big Marsh Swamp in Robeson County, North Carolina. It was built in 1990, so it is 35 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,000 vehicles a day, roughly 7% of them trucks, projected to reach 24,000 by 2040. The structure is 102 ft (31 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesNC71
CrossesBig Marsh Swamp
Location0.3 Mi. N. Jct. SR1752
RouteState Highway 71
Coordinates34.86432, -79.10485
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.9 US tons
Inventory rating46 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20 + Mod
Structure length102 ft (31 m)
Longest span48 ft (14.6 m)
Deck width33 ft (10 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,000 (2019)
Projected traffic24,000 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NC71 over Big Marsh Swamp built?

It was built in 1990, making it 35 years old in 2025.

What condition is NC71 over Big Marsh Swamp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2021.

How much traffic does NC71 over Big Marsh Swamp carry?

About 12,000 vehicles per day (2019 count), of which roughly 7% are trucks.

How long is NC71 over Big Marsh Swamp?

The structure is 102 ft (31 m) long with a longest span of 48 ft (14.6 m) and a deck 33 ft wide.

Who owns NC71 over Big Marsh Swamp?

It is owned by the State Highway Agency.