US Bridges

US220BUS over US64

Good

Randolph County, North Carolina · 0.4 MI S JCT SR1146 · Structure no. 000000001511162

Built
2017
8 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
251 ft
2 main spans
Daily traffic
6,500
2022 count
Owner
State
State Highway Agency

About this bridge

US220BUS over US64 is a prestressed concrete continuous stringer/multi-beam or girder carrying US220BUS over US64 in Randolph County, North Carolina. It was built in 2017, so it is 8 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,500 vehicles a day, roughly 12% of them trucks, projected to reach 13,000 by 2040. The structure is 251 ft (76.5 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesUS220BUS
CrossesUS64
Location0.4 MI S JCT SR1146
RouteU.S. Route 220
Coordinates35.64782, -79.82403
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88 US tons
Inventory rating53.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHL 93
Structure length251 ft (76.5 m)
Longest span127 ft (38.7 m)
Deck width43 ft (13.2 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,500 (2022)
Projected traffic13,000 by 2040
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US220BUS over US64 built?

It was built in 2017, making it 8 years old in 2025.

What condition is US220BUS over US64 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does US220BUS over US64 carry?

About 6,500 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is US220BUS over US64?

The structure is 251 ft (76.5 m) long with a longest span of 127 ft (38.7 m) and a deck 43 ft wide.

Who owns US220BUS over US64?

It is owned by the State Highway Agency.