US Bridges

SR1619 over I85BUS US29 US70

Good

Randolph County, North Carolina · 0.4 Mi. N. Jct. SR1616 · Structure no. 000000001510136

Built
2017
8 years old
Condition
Good
inspected March 2023
Type
Tee Beam
Prestressed Concrete Continuous
Length
247 ft
4 main spans
Daily traffic
3,900
2017 count
Owner
State
State Highway Agency

About this bridge

SR1619 over I85BUS US29 US70 is a prestressed concrete continuous tee beam carrying SR1619 over I85BUS US29 US70 in Randolph County, North Carolina. It was built in 2017, so it is 8 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,900 vehicles a day, roughly 8% of them trucks, projected to reach 7,800 by 2040. The structure is 247 ft (75.2 m) long and 51 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR1619
CrossesI85BUS US29 US70
Location0.4 Mi. N. Jct. SR1616
RouteState Highway 1619
Coordinates35.91573, -80.03025
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.9 US tons
Inventory rating53.9 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4 (+2 approach)
Design loadH 10
Structure length247 ft (75.2 m)
Longest span122 ft (37.1 m)
Deck width51 ft (15.4 m)
Roadway width48 ft (14.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,900 (2017)
Projected traffic7,800 by 2040
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR1619 over I85BUS US29 US70 built?

It was built in 2017, making it 8 years old in 2025.

What condition is SR1619 over I85BUS US29 US70 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does SR1619 over I85BUS US29 US70 carry?

About 3,900 vehicles per day (2017 count), of which roughly 8% are trucks.

How long is SR1619 over I85BUS US29 US70?

The structure is 247 ft (75.2 m) long with a longest span of 122 ft (37.1 m) and a deck 51 ft wide.

Who owns SR1619 over I85BUS US29 US70?

It is owned by the State Highway Agency.