SR1181 (new Hope) over Laniers Creek
FairRandolph County, North Carolina · 0.3MI. N. Jct. SR1180 · Structure no. 000000001510032
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 33 ft
- 2 main spans
- Daily traffic
- 830
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
SR1181 (new Hope) over Laniers Creek is a wood or timber stringer/multi-beam or girder carrying SR1181 (new Hope) over Laniers Creek in Randolph County, North Carolina. It was built in 2005, so it is 20 years old, younger than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 830 vehicles a day, roughly 6% of them trucks, projected to reach 1,660 by 2040. The structure is 33 ft (10 m) long and 27 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR1181 (new Hope) over Laniers Creek built?
It was built in 2005, making it 20 years old in 2025.
What condition is SR1181 (new Hope) over Laniers Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does SR1181 (new Hope) over Laniers Creek carry?
About 830 vehicles per day (2017 count), of which roughly 6% are trucks.
How long is SR1181 (new Hope) over Laniers Creek?
The structure is 33 ft (10 m) long with a longest span of 16 ft (4.8 m) and a deck 27 ft wide.
Who owns SR1181 (new Hope) over Laniers Creek?
It is owned by the State Highway Agency.