US Bridges

SR1005 over Cedar Gut

Good

Pamlico County, North Carolina · 1.4 MI W JCT SR1116 · Structure no. 000000001370028

Built
2024
1 years old
Condition
Good
inspected June 2024
Type
Slab
Prestressed Concrete
Length
102 ft
2 main spans
Daily traffic
1,000
2021 count
Owner
State
State Highway Agency

About this bridge

SR1005 over Cedar Gut is a prestressed concrete slab carrying SR1005 over Cedar Gut in Pamlico County, North Carolina. It was built in 2024, so it is 1 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 6% of them trucks, projected to reach 2,000 by 2040. The structure is 102 ft (31 m) long and 39 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR1005
CrossesCedar Gut
Location1.4 MI W JCT SR1116
RouteState Highway 1005
Coordinates35.03621, -76.85692
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.9 US tons
Inventory rating42 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHL 93
Structure length102 ft (31 m)
Longest span65 ft (19.8 m)
Deck width39 ft (11.8 m)
Roadway width35 ft (10.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2021)
Projected traffic2,000 by 2040
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR1005 over Cedar Gut built?

It was built in 2024, making it 1 years old in 2025.

What condition is SR1005 over Cedar Gut in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does SR1005 over Cedar Gut carry?

About 1,000 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is SR1005 over Cedar Gut?

The structure is 102 ft (31 m) long with a longest span of 65 ft (19.8 m) and a deck 39 ft wide.

Who owns SR1005 over Cedar Gut?

It is owned by the State Highway Agency.