US Bridges

I40 & I85 Ebl over SR1239

Good

Orange County, North Carolina · 1.9 Mi. E. Jct. SR1120 · Structure no. 000000001350040

Built
1996
29 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
117 ft
1 main span
Daily traffic
57,500
2022 count
Owner
State
State Highway Agency

About this bridge

I40 & I85 Ebl over SR1239 is a steel stringer/multi-beam or girder carrying I40 & I85 Ebl over SR1239 in Orange County, North Carolina. It was built in 1996, so it is 29 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 57,500 vehicles a day, roughly 23% of them trucks, projected to reach 115,000 by 2040. The structure is 117 ft (35.6 m) long and 79 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI40 & I85 Ebl
CrossesSR1239
Location1.9 Mi. E. Jct. SR1120
RouteInterstate 40
Coordinates36.07265, -79.15972
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating65.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length117 ft (35.6 m)
Longest span113 ft (34.4 m)
Deck width79 ft (24.2 m)
Roadway width76 ft (23.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic57,500 (2022)
Projected traffic115,000 by 2040
Trucks23%
Lanes on structure4
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I40 & I85 Ebl over SR1239 built?

It was built in 1996, making it 29 years old in 2025.

What condition is I40 & I85 Ebl over SR1239 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does I40 & I85 Ebl over SR1239 carry?

About 57,500 vehicles per day (2022 count), of which roughly 23% are trucks.

How long is I40 & I85 Ebl over SR1239?

The structure is 117 ft (35.6 m) long with a longest span of 113 ft (34.4 m) and a deck 79 ft wide.

Who owns I40 & I85 Ebl over SR1239?

It is owned by the State Highway Agency.