US Bridges

SR1336 over I40

Good

New Hanover County, North Carolina · 0.5 Mi.E. of JCT.SR1318 · Structure no. 000000001290042

Built
1983
42 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
206 ft
2 main spans
Daily traffic
6,000
2022 count
Owner
State
State Highway Agency

About this bridge

SR1336 over I40 is a steel stringer/multi-beam or girder carrying SR1336 over I40 in New Hanover County, North Carolina. It was built in 1983, so it is 42 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,000 vehicles a day, roughly 7% of them trucks, projected to reach 12,000 by 2040. The structure is 206 ft (62.7 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR1336
CrossesI40
Location0.5 Mi.E. of JCT.SR1318
RouteState Highway 1336
Coordinates34.32742, -77.87336
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating82.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length206 ft (62.7 m)
Longest span102 ft (31 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,000 (2022)
Projected traffic12,000 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR1336 over I40 built?

It was built in 1983, making it 42 years old in 2025.

What condition is SR1336 over I40 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does SR1336 over I40 carry?

About 6,000 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is SR1336 over I40?

The structure is 206 ft (62.7 m) long with a longest span of 102 ft (31 m) and a deck 43 ft wide.

Who owns SR1336 over I40?

It is owned by the State Highway Agency.