SR2018 over Crane Creek
FairPosted for loadMoore County, North Carolina · 0.4 Mi. S. Jct. NC690 · Structure no. 000000001250198
- Built
- 1953
- 72 years old, rebuilt 1987
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 61 ft
- 2 main spans
- Daily traffic
- 1,100
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR2018 over Crane Creek is a steel stringer/multi-beam or girder carrying SR2018 over Crane Creek in Moore County, North Carolina. It was built in 1953 and reconstructed in 1987, so it is 72 years old, older than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,100 vehicles a day, roughly 6% of them trucks, projected to reach 2,200 by 2044. The structure is 61 ft (18.5 m) long and 20 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR2018 over Crane Creek built?
It was built in 1953, making it 72 years old in 2025. It was reconstructed in 1987.
What condition is SR2018 over Crane Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does SR2018 over Crane Creek carry?
About 1,100 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is SR2018 over Crane Creek?
The structure is 61 ft (18.5 m) long with a longest span of 40 ft (12.1 m) and a deck 20 ft wide.
Who owns SR2018 over Crane Creek?
It is owned by the State Highway Agency.