US Bridges

Parkway Avenue over Stewart Creek

Fair

Mecklenburg County, North Carolina · 0.05 Mi.S.Jct.Norwood Dr. · Structure no. 000000001190370

Built
1978
47 years old
Condition
Fair
inspected April 2024
Type
Slab
Prestressed Concrete
Length
122 ft
3 main spans
Daily traffic
3,400
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Parkway Avenue over Stewart Creek is a prestressed concrete slab carrying Parkway Avenue over Stewart Creek in Mecklenburg County, North Carolina. It was built in 1978, so it is 47 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,400 vehicles a day, roughly 7% of them trucks, projected to reach 6,800 by 2040. The structure is 122 ft (37.1 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesParkway Avenue
CrossesStewart Creek
Location0.05 Mi.S.Jct.Norwood Dr.
RouteCity Street 0
Coordinates35.24803, -80.87606
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length122 ft (37.1 m)
Longest span39 ft (11.8 m)
Deck width40 ft (12.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,400 (2022)
Projected traffic6,800 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Parkway Avenue over Stewart Creek built?

It was built in 1978, making it 47 years old in 2025.

What condition is Parkway Avenue over Stewart Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Parkway Avenue over Stewart Creek carry?

About 3,400 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is Parkway Avenue over Stewart Creek?

The structure is 122 ft (37.1 m) long with a longest span of 39 ft (11.8 m) and a deck 40 ft wide.

Who owns Parkway Avenue over Stewart Creek?

It is owned by the City or Municipal Highway Agency.