US Bridges

SR1625 over I85

Good

Mecklenburg County, North Carolina · 0.1 Mi. N. Jct. SR1921 · Structure no. 000000001190067

Built
1992
33 years old
Condition
Good
inspected June 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
212 ft
4 main spans
Daily traffic
8,300
2018 count
Owner
State
State Highway Agency

About this bridge

SR1625 over I85 is a prestressed concrete stringer/multi-beam or girder carrying SR1625 over I85 in Mecklenburg County, North Carolina. It was built in 1992, so it is 33 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,300 vehicles a day, roughly 7% of them trucks, projected to reach 16,600 by 2040. The structure is 212 ft (64.6 m) long and 53 ft wide.

CarriesSR1625
CrossesI85
Location0.1 Mi. N. Jct. SR1921
RouteState Highway 1625
Coordinates35.25426, -80.98251
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85 US tons
Inventory rating43 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length212 ft (64.6 m)
Longest span74 ft (22.5 m)
Deck width53 ft (16.1 m)
Roadway width49 ft (15 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,300 (2018)
Projected traffic16,600 by 2040
Trucks7%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR1625 over I85 built?

It was built in 1992, making it 33 years old in 2025.

What condition is SR1625 over I85 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does SR1625 over I85 carry?

About 8,300 vehicles per day (2018 count), of which roughly 7% are trucks.

How long is SR1625 over I85?

The structure is 212 ft (64.6 m) long with a longest span of 74 ft (22.5 m) and a deck 53 ft wide.

Who owns SR1625 over I85?

It is owned by the State Highway Agency.