US Bridges

NC24 over A C & Western Railroad

Fair

Mecklenburg County, North Carolina · 0.3 Mi. N. Jct. SR2820 · Structure no. 000000001190055

Built
1992
33 years old
Condition
Fair
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
135 ft
3 main spans
Daily traffic
29,500
2022 count
Owner
State
State Highway Agency

About this bridge

NC24 over A C & Western Railroad is a prestressed concrete stringer/multi-beam or girder carrying NC24 over A C & Western Railroad in Mecklenburg County, North Carolina. It was built in 1992, so it is 33 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 29,500 vehicles a day, roughly 12% of them trucks, projected to reach 59,000 by 2040. The structure is 135 ft (41.1 m) long and 66 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesNC24
CrossesA C & Western Railroad
Location0.3 Mi. N. Jct. SR2820
RouteState Highway 24
Coordinates35.22763, -80.72661
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.9 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length135 ft (41.1 m)
Longest span59 ft (17.9 m)
Deck width66 ft (20.2 m)
Roadway width50 ft (15.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,500 (2022)
Projected traffic59,000 by 2040
Trucks12%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NC24 over A C & Western Railroad built?

It was built in 1992, making it 33 years old in 2025.

What condition is NC24 over A C & Western Railroad in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does NC24 over A C & Western Railroad carry?

About 29,500 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is NC24 over A C & Western Railroad?

The structure is 135 ft (41.1 m) long with a longest span of 59 ft (17.9 m) and a deck 66 ft wide.

Who owns NC24 over A C & Western Railroad?

It is owned by the State Highway Agency.