US Bridges

I-40 Wbl over SR1760

Fair

McDowell County, North Carolina · 3.5 MI.E.JCT.NC226 · Structure no. 000000001110152

Built
1958
67 years old, rebuilt 1997
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
194 ft
4 main spans
Daily traffic
15,750
2020 count
Owner
State
State Highway Agency

About this bridge

I-40 Wbl over SR1760 is a steel stringer/multi-beam or girder carrying I-40 Wbl over SR1760 in McDowell County, North Carolina. It was built in 1958 and reconstructed in 1997, so it is 67 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15,750 vehicles a day, roughly 23% of them trucks, projected to reach 31,500 by 2040. The structure is 194 ft (59.1 m) long and 43 ft wide.

CarriesI-40 Wbl
CrossesSR1760
Location3.5 MI.E.JCT.NC226
RouteInterstate 40
Coordinates35.68499, -81.91239
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.9 US tons
Inventory rating40.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length194 ft (59.1 m)
Longest span63 ft (19.2 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,750 (2020)
Projected traffic31,500 by 2040
Trucks23%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-40 Wbl over SR1760 built?

It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1997.

What condition is I-40 Wbl over SR1760 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does I-40 Wbl over SR1760 carry?

About 15,750 vehicles per day (2020 count), of which roughly 23% are trucks.

How long is I-40 Wbl over SR1760?

The structure is 194 ft (59.1 m) long with a longest span of 63 ft (19.2 m) and a deck 43 ft wide.

Who owns I-40 Wbl over SR1760?

It is owned by the State Highway Agency.