IRR BIA RTE 412 over Soco Creek
GoodJackson County, North Carolina · 9.7 KM E of Cherokee Nc · Structure no. 00000000000S246
- Built
- 1978
- 47 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 84 ft
- 1 main span
- Daily traffic
- 514
- 2024 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 412 over Soco Creek is a prestressed concrete stringer/multi-beam or girder carrying IRR BIA RTE 412 over Soco Creek in Jackson County, North Carolina. It was built in 1978, so it is 47 years old, older than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 514 vehicles a day, roughly 5% of them trucks, projected to reach 632 by 2044. The structure is 84 ft (25.6 m) long and 32 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 412 over Soco Creek built?
It was built in 1978, making it 47 years old in 2025.
What condition is IRR BIA RTE 412 over Soco Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does IRR BIA RTE 412 over Soco Creek carry?
About 514 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is IRR BIA RTE 412 over Soco Creek?
The structure is 84 ft (25.6 m) long with a longest span of 76 ft (23.3 m) and a deck 32 ft wide.
Who owns IRR BIA RTE 412 over Soco Creek?
It is owned by the Bureau of Indian Affairs.