US Bridges

SR2316 over Southern Railroad

Fair

Iredell County, North Carolina · 100 Ft. N. Jct. US70 · Structure no. 000000000970308

Built
1992
33 years old
Condition
Fair
inspected March 2024
Type
Slab
Prestressed Concrete
Length
132 ft
3 main spans
Daily traffic
3,100
2022 count
Owner
State
State Highway Agency

About this bridge

SR2316 over Southern Railroad is a prestressed concrete slab carrying SR2316 over Southern Railroad in Iredell County, North Carolina. It was built in 1992, so it is 33 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,100 vehicles a day, roughly 7% of them trucks, projected to reach 6,200 by 2040. The structure is 132 ft (40.2 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR2316
CrossesSouthern Railroad
Location100 Ft. N. Jct. US70
RouteState Highway 2316
Coordinates35.75713, -80.81096
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80.9 US tons
Inventory rating48 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length132 ft (40.2 m)
Longest span60 ft (18.2 m)
Deck width33 ft (10 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,100 (2022)
Projected traffic6,200 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR2316 over Southern Railroad built?

It was built in 1992, making it 33 years old in 2025.

What condition is SR2316 over Southern Railroad in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does SR2316 over Southern Railroad carry?

About 3,100 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is SR2316 over Southern Railroad?

The structure is 132 ft (40.2 m) long with a longest span of 60 ft (18.2 m) and a deck 33 ft wide.

Who owns SR2316 over Southern Railroad?

It is owned by the State Highway Agency.