Firebreak 9 over Piney Bottom Creek
PoorClosed to trafficHoke County, North Carolina · Range CC2 (e) · Structure no. DAPFORBRA0BRD61
- Built
- 1960
- 65 years old
- Condition
- Poor
- inspected September 2014
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 1
- 2014 count
- Owner
- Federal
- Army
About this bridge
Firebreak 9 over Piney Bottom Creek is a wood or timber stringer/multi-beam or girder carrying Firebreak 9 over Piney Bottom Creek in Hoke County, North Carolina. It was built in 1960, so it is 65 years old, older than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 1 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.
It carries about 1 vehicles a day, projected to reach 2 by 2036. The structure is 30 ft (9.1 m) long and 12 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 1 Imminent Failure | Major deterioration or section loss present in critical structural components. Bridge is closed to traffic but corrective action may put it back in light service. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 2 Critical | Advanced deterioration of primary structural elements. Bridge may be closed until corrective action is taken. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Firebreak 9 over Piney Bottom Creek built?
It was built in 1960, making it 65 years old in 2025.
What condition is Firebreak 9 over Piney Bottom Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2014.
How much traffic does Firebreak 9 over Piney Bottom Creek carry?
About 1 vehicles per day (2014 count).
How long is Firebreak 9 over Piney Bottom Creek?
The structure is 30 ft (9.1 m) long with a longest span of 15 ft (4.6 m) and a deck 12 ft wide.
Who owns Firebreak 9 over Piney Bottom Creek?
It is owned by the Army.